Operation safety risk analysis method of hydropower project considering time-dependent effect
Zhang Sherong,YanLei
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 51-55
Keywords: operation safety of hydropower project risk analysis risk rate assessment time-dependent reliability
Analysis of synergy degree and its influencing factors in hydropower EPC project management
Jiwei ZHU, Hua GAO, Jiangrui WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 3, Pages 402-411 doi: 10.1007/s42524-020-0098-0
Keywords: hydropower project EPC mode synergy degree model grey relational analysis
Yang Aiming,Duan Guoxue,Ma Nengwu
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 117-122
Based on 17 year monitoring data of the Three Gorges Project (TGP), theand pressure, as well as stress and strain of the main structures in the period of construction and operationMeanwhile, the operational status and safety features of various structures in different constructionIt is concluded that the safety indexes of TGP are within the allowable range of design and the structuresare safe in operation.
Keywords: Three Gorges Project (TGP) structure safety monitoring data analysis
Zude ZHOU, Desheng JIANG, Quan LIU
Frontiers of Mechanical Engineering 2009, Volume 4, Issue 1, Pages 5-14 doi: 10.1007/s11465-009-0011-3
Keywords: fiber Bragg grating sensor (FBGS) mechanical equipment operation safety embedded technology high-speed
Li Yongan
Strategic Study of CAE 2003, Volume 5, Issue 10, Pages 1-7
Keywords: Hydropower project financing capital operations
Fan Qixiang,Lu Youmei
Strategic Study of CAE 2010, Volume 12, Issue 8, Pages 30-36
Hydropower is a key resource in China.The calls for a number of issues to be properly solved, such as construction management systems in projectdevelopment, relocation of local populace, hydropower complex construction, environmental protectionand project construction procedures are rising at the same time.paper probes the issue of project management in the development of hydropower resources in western China
Keywords: project management hydropower resources development of western regions Jinsha River
Key technical innovations in the construction of Baihetan Hydropower Station Project
Frontiers of Engineering Management 2023, Volume 10, Issue 2, Pages 367-372 doi: 10.1007/s42524-023-0253-5
Keywords: ultra-high arch dam columnar jointed basalt low-heat cement concrete temperature controlled crack prevention million-kilowatt unit intelligent construction
Three Gorges Project Advancing Technology for Hydropower Equipment Manufacturing in China
Liang Weiyan
Strategic Study of CAE 2002, Volume 4, Issue 12, Pages 1-5
The Three Gorges Project is the largest hydropower station in the world with 26 sets of 700MW hydropowertechnology based on their technology tackling activities carried out in the passed two decades for large hydropowertechnology innovations and tried to be self-reliant on developing, designing and manufacturing large hydropowermanufacturers, which laid a foundation for supplying good quality, advanced and reliable units for large hydropower
Keywords: Three Gorges Project hydropower units self-reliant development technology advancement
Cycle Operation Network and Its Application in Earthwork Project
Hu Chengshun,Mao Xiaojun
Strategic Study of CAE 2007, Volume 9, Issue 10, Pages 71-74
Keywords: cycle operation network simulation earthwork project
Operation and regulation of Three Gorges Reservoir
Zhang Shuguang,Zhou Man
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 61-65
Keywords: operation and regulation Three Gorges Project
Wang Shougen
Strategic Study of CAE 2004, Volume 6, Issue 7, Pages 88-93
The dam of Qiaoqi Hydropower Project is 123m high, in which it is the first time for the spreadingfoundation are calculated to analyze the rationality of the control standard for these materials and the safety
Keywords: Qiaoqi Hydropower Project spreading gradation crushed stones and earth impervious material engineering
Wang Shougen
Strategic Study of CAE 2005, Volume 7, Issue 3, Pages 78-83
The abutment is the part where the by-pass seepage and contact erosion often happen to make the dam not work normally, which is the key point during design and construction, so Design Specifications for Rolled Earth-Rock Fill Dams (SL274-2001) require excavating into the slightly weathered rock mass for the core wall and the reversed filter and the abutment. The spreading gradation earth-rock fill dam with crushed-stone-earth core wall is 123m high, and the highly weathering natural depth of the phyllite and sandstone at abutments on both bank is 14.6~66.4m. According to the Specification, the excavation quantity is enormous. It is practically excavated into the highly weathering zone, which can not meet with the Specification. The treatment scheme for the highly weathering rock mass on both abutments and grouting tests and grouting technics are introduced in detail. The feasibility to adopt consolidation grouting and seepage treatment measures is argued and the treatment measures and construction control standards are proposed.
Keywords: Qiaoqi Hydropower Station earth-rock dam treatment of abutment highly weathered rock mass consolidation
Wang Mengjun,Zhang Zhensen
Strategic Study of CAE 2011, Volume 13, Issue 8, Pages 62-66
Keywords: significant construction project technological innovation network formation mechanism operation mechanism
An information management system of safety assessment and warning for high earth-rockfill dam
Zhang Zongliang,Yu Yuzhen,Zhang Bingyin
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 33-37
Keywords: Nuozhadu Hydropower Station dam safety assessment warning information management system back-analysis
Safety monitoring and analysis on crossbeam supporting system of Three Gorges Project ship lift
Liu Xinqing,He Wei
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 108-112
Safety monitoring on crossbeam supporting system of Three Gorges ProjectMeanwhile, the safety monitoring plan and technology system can provide a reference for the safety monitoring
Keywords: Three Gorges Project ship lift safety monitoring crossbeam supporting system Bailey rack
Title Author Date Type Operation
Operation safety risk analysis method of hydropower project considering time-dependent effect
Zhang Sherong,YanLei
Journal Article
Analysis of synergy degree and its influencing factors in hydropower EPC project management
Jiwei ZHU, Hua GAO, Jiangrui WANG
Journal Article
The analysis on structure safety monitoring data of Three Gorges Project in construction and operation
Yang Aiming,Duan Guoxue,Ma Nengwu
Journal Article
Digital monitoring and health diagnosis for mechanical equipment operation safety based on fiber Bragg
Zude ZHOU, Desheng JIANG, Quan LIU
Journal Article
Financing & Capital Operations of Large Hydropower Projects——A Summary Review of Financing Strategies& Practices in Three Gorges Project
Li Yongan
Journal Article
Project management of hydropower resource development in western China: case study on the lower reaches
Fan Qixiang,Lu Youmei
Journal Article
Key technical innovations in the construction of Baihetan Hydropower Station Project
Journal Article
Three Gorges Project Advancing Technology for Hydropower Equipment Manufacturing in China
Liang Weiyan
Journal Article
Cycle Operation Network and Its Application in Earthwork Project
Hu Chengshun,Mao Xiaojun
Journal Article
Characteristics and Design of the Crushed Stones and Earth as Impervious Material for the Dam in Qiaoqi Hydropower
Wang Shougen
Journal Article
Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project
Wang Shougen
Journal Article
Analysis on the technological innovation network formation and operation mechanism for the significantconstruction project
Wang Mengjun,Zhang Zhensen
Journal Article
An information management system of safety assessment and warning for high earth-rockfill dam
Zhang Zongliang,Yu Yuzhen,Zhang Bingyin
Journal Article